Refurb

77-79 Farringdon Road


Project highlights

  • Structural modifications
  • Old to new
  • Period building

Project stats

  • Client
    National Farmers Union
  • Location
    Farringdon Road, London
  • Sector
    Property
  • Duration
    16 Weeks
  • Square Ft.
    23,344
  • Project Manager
    Rider Levett Bucknall
  • Designer
    Mark Pinney Associates

Covering 6 floors, this project incorperated the removal of an existing concrete staircore, and the addition of central core WC facilities to optimise lettable floor area.

This project was delivered to a high standard in an ambitious 16 weeks, with the existing Ground and Lower Ground floor tenants still in occupation.