Refurb

Britton Street


Project highlights

  • Front facade replacement
  • New build works
  • Challenging reception design

Project stats

  • Client
    Nuveen
  • Location
    Farringdon
  • Sector
    Property
  • Duration
    44 weeks
  • Square Ft.
    17,000 sq.ft
  • Project Manager
    Cogent BC
  • Designer
    ORMS

A Cat A fit out and façade replacement across 5 floors on Britton Street.

A focal point of the project was the replacement of the existing façade with a mechanically fixed brick slip system that replicated the traditional brickwork of the original building and was undertaken as a CDP element by 21.

The building also required installation of new structural steelwork throughout and all door and window frames were replaced with high quality, solid oak double glazed frames.

Internally a high spec Cat A fit-out was completed that featured veneered oak flooring with exposed services and shot blasted concrete columns and soffits to create a modern and industrial feel throughout.