Cat B

Toppan Merrill


Project highlights

  • Fast-track programme
  • Design & Build
  • Bespoke Joinery

Project stats

  • Client
    Toppan Merrill
  • Location
    Ropemaker Street, London
  • Duration
    8 Weeks
  • Square Ft.
    7,000
  • Project Manager
    Cushman & Wakefield

The works for Toppan Merrill consisted of a category B fit out of a vacant floor space within the iconic City Point Building in Moorgate.

The scope of works involved the formation of individual board rooms, client lounge break out areas, general office spacing and a reception area. Bespoke joinery was designed and produced to include Corian, laminate and painted timber finishes for the reception desk, tea point areas and their client lounge breakfast bar.

Ensuring the space was practical yet for our client, our design comprised a glazed partition and door system, used to segregate the board rooms with manifestations used for privacy. Alongside a variety of floor finished used throughout, including carpet to the reception and board room areas, with Havwoods Oak flooring to the client lounge.